Kuala Lumpur Putrajaya Highway
Leighton Asia was the lead contractor for the design and construction of a dedicated highway linking Kuala Lumpur to Putrajaya, the new administrative centre south of the capital.
The project comprised 26 km of dual carriageway with two to three lanes in each direction—10 km elevated and 16 km at grade.
The highway includes four major interchanges, two toll plazas, and modern features such as toll systems, lighting, variable message signs, landscaping, and noise barriers.
Details
Location
Kuala Lumpur, MalaysiaStatus
CompletedSector
RoadsExpertise
Infrastructure
Roads
Transport
