Tanjung Bin 4 Power Plant
Leighton Asia delivered critical marine and civil works as part of a 1,000 MW extension to a coal-fired thermal power plant, increasing its total capacity from 2,100 MW to 3,100 MW.
The scope of works included the design and construction of a cooling water intake and pump station and a 1.65-kilometre offshore culvert structure.
Project involved marine piling, dredging, offsite manufacture, marine delivery, installation, grout sock seals, rock armour protection, outfall diffusers, and navigation markers.
Details
Location
MalaysiaStatus
CompletedSector
Energy, Power, RenewablesExpertise
Energy
Renewables