Tseung Kwan O - Lam Tin Tunnel
Leighton Asia, in a joint venture project, has delivered the construction of the 2.2 km dual two-lane main tunnel for the Tseung Kwan O - Lam Tin Tunnel.
Tseung Kwan O – Lam Tin Tunnel meet the traffic demand arising from the anticipated population increase in Tseung Kwan O through the future development of the district.
Other than the main tunnel, the scope of works also included associated slip roads, branch tunnels, viaducts and tunnel portal facilities.
The works involved the delivery of two ventilation buildings and an administration building, as well as implementation of all associated building and supporting works.