Supreme Energy Rantau Dedap Geothermal

位置
Muara Enim, South Sumatera, Indonesia
范畴
资源基础建设
业务
  • Roads
客户
PT Supreme Energy Rantau Dedap
合约类型
Schedule of rates
状态
完成
热门

Our works included the physical works necessary to allow the geothermal exploration drilling program to be undertaken, which includes:

  • Upgrading the 3m width of existing public road from Kota Agung to Tunggul Bute (12.7km)
  • Construction of 12-km gravel-surfaced new access road from Tunggul Bute to Rantau Dedap and from Rantau Dedap to Facility Area including various culverts, drainage channels, and slope facings along the road
  • Construction of 23km gravel-surfaced new access road from Facility Area to well pads, including various culverts, drainage channels, and slope facings along the road
  • Construction of gravel-surfaced well pads at 4separate location, including HDPE-lined sumps and fencing for preparation of drilling works
  • Water supply system including water intake, 17km of 200mm CS on-ground pipeline, pumps and break tanks for water supply to well pads
  • Laydown area for pipe yard and Steel structural building for warehouse and cutting waste bunker



 

 

 

 