Duo Cell Cement Silo and Bulk Loading Facility
Following our work on the construction of a 35,000-tonne duo-cell cement silo for the largest cement supplier in Singapore at a site in Pulau Damar Laut, Leighton Asia built a second 30,000-tonne silo at the site several years later.
The second silo is 73m high with a 24m diameter outer cell and a 14m diameter inner cell. Leighton Asia also built a new bulk loading facility to form two large hoppers and upgraded the permanent power supply.