Downtown Line Stage 3 Contract 935 - Jalan Besar Station and Associated Tunnels

位置
Singapore
范畴
铁路
业务
  • 隧道
客户
Land Transport Authority
合约类型
仅建造
状态
完成
热门

Downtown Line Stage 3 is a key component of Singapore’s 42km long Downtown Line and extends the existing Mass Rapid Transit railway network.

Leighton Asia, with its joint venture partner, has constructed the four-level underground Jalan Besar Station, and with a platform, mezzanine, concourse and linkway, and completed related civil, structural, architectural, plumbing, drainage, landscaping and reinstatement works.

Twin tunnels approximately 775m in length between Jalan Besar Station and Bencoolen Station were built using two tunnel-boring machines.

 

 