简体中文

LinkedIn

Instagram

  • 公司简介
  • 最新动向
  • 主要工程
  • 业务范畴
  • 核心价值
  • 加入我们
简体中文

Philippines

Project announcement

Leighton Asia

26 April 2023

CIMIC's Leighton Asia wins US$283m railway project in Philippines

CIMIC Group company Leighton Asia has been selected by the Philippines Department of Transportation to construct a section of the North South Commuter Railway System – South Commuter Railway Project (SCRP), a project that will ease road congestion around Manila.

The Leighton-First Balfour joint venture will construct Contract Package S-03B (CP S-03B) for the project, generating revenue of approximately US$283 million for Leighton Asia.

CIMIC Group Executive Chairman Juan Santamaria said: “The project is part of the Government’s larger strategic transportation network to boost economic and urban growth between metro Manila and southern Luzon. We have a proven history in the region and we are pleased to be selected to deliver a vital infrastructure project that will benefit the community for decades to come.”

Leighton Asia Managing Director Brad Davey said: “Leighton Asia has a strong track record and expertise in delivering world-class railway projects. Our portfolio includes the Express Rail Link West Kowloon Terminus Station in Hong Kong, the largest underground railway station in the world. We are honoured to deliver the SCRP CP S-03B package and are committed to leveraging our 26 years of local experience in the Philippines to provide a safe and quality asset for our client and community.”

The works include civil engineering, tunnel and building works for approximately 6.1km of the railway with 4.7km of the underground railway and 1.4km of at-grade railway. It also includes the construction of the FTI Station, tunnelling works to connect to the Metro Manila Subway Project Senate Station, and mechanical, electrical, façade and other ancillary works.

SCR CP S-03B is a section of the nearly 56km long SCRP financed by the Asian Development Bank. It runs along the existing Philippine National Railway and is comprised of 19 stations. The SCR will connect metro Manila to Calamba, southern Luzon and ease road congestion upon completion. 

Construction is anticipated to commence in Q3-Q4 2023 and complete by 2029.

*Photo Courtesy of Presidential Communications Office (PCO)

50年来,礼顿亚洲以建设和交付一系列享负盛名、遍布亚洲的基建工程,领先业界。

公司简介
  • 关于我们
    • 礼顿50周年
      • 公司历史
        • 公司管治
          • 管理团队
            • 新闻中心
              加入我们
              • 公司文化
                • 见习生计划及暑期实习
                  • 人才培训
                    • 职位空缺
                      业务范畴
                      • 土木工程
                        • 科技与数码工程
                          • 机电工程
                            • 楼宇建筑
                              • 石油和天然气
                                核心价值
                                • 安全和健康
                                  • 可持续性
                                    • 社区关系
                                      • 多元共融
                                        使用条款
                                        • 使用条款
                                          • 私隐政策
                                            • 收集个人资料声明
                                              联络我们
                                              • 我们的办公室
                                                • 一般查询及媒体联络
                                                  • 招聘查询
                                                    • 供应商查询
                                                      Copyright © 2023 CIMIC Group