NLEX R10 exit ramp

位置
Philippines
范畴
公路
业务
  • 交通基础建设
客户
NLEX Corporation
合约类型
仅建造
状态
进行中
热门

The project is a 2.6km dual-lane, elevated tollway with three exit ramps of 1.3km in total length. It links the NLEX Segment 10 expressway (currently under construction by Leighton Asia) to the R10 Road and provides a continuation of Harbour Link.
 
Works involve over 200 bored piles with diameters ranging from 2.5 to 3m; 55,000m3 concrete; 12,700 tons of reinforcing; approximately 900 precast girders across 115 spans and around 1,450 tons of steel girders, as well as all associated roadworks, electrical and mechanical installations, and landscaping works.
 
Leighton Asia has established a long term working relationship with MPTC since the construction of the first phase of NLEX infrastructure project in 1998.

 

 